DreamBox Math: Progress Report FAQs

Support Icon_Announcement Callout Checkbox.png

 

The Growth Report is now the Progress Report!

The Progress Report continues to provide comprehensive insight into each student's progress within the DreamBox Math curriculum throughout the school year, informing educators' instruction, intervention, and support.

This article focuses on frequently asked questions (FAQs) about the DreamBox Math Progress Report. 

Support Icon-DBL_Tip Box_50px.png
Looking for an overview of the Progress Report? Click here to open our help article. 

 

Accessing and Navigating the Progress Report

Q: Why can’t I see the Progress Report tile on the Reports page?

 A: The Progress Report tile will be visible on the Reports page on the first day of the new school year. If the previous school year has ended and the new school year hasn't started, the Progress report won't be visible. Check your school start and stop dates on the Reports page. If they are not correct, please reach out to our Customer Support Team

Support Icon-DBL_Tip Box_50px.png
The Reports page will show the previous year’s school dates until the first day of your new school year.

 

Q: Why can't I update filters inside the report to see a custom group I created? 

 A: To see custom groups in the Progress Report, select Groups from the Reports page before you open the report. If you don't do this before opening the Progress Report, you will not be able to see or move between your custom groups.

Support Icons_Learn More_50px.png Click here to open directions to set Group filters and see additional FAQs. 

 

Initial Standing, Placement, and Progress Report Metrics

Q: What does it mean if I see "student has not been placed" instead of a number on the Progress Report?

 A: If you do not see a number in the Initial Standing column of the Progress report, it means the student hasn't completed the placement tasks required to determine their initial standing, or starting point, in DreamBox Math. The placement tasks depend on the district's subscription type. 

Math_Progress Report_Classroom View_Not Placed Students.png

(Click image to enlarge it)

Support Icons_Learn More_50px.png Click here to learn how DreamBox Math determines a student's initial standing. 

 

Q: Is a student ‘placed’ in the Progress report if they log in over the summer?

 A: The Progress report will only capture data during your school/district's calendar year dates. If a student signs in and plays DreamBox Math over the summer, when they sign in during the first day of the new school year and either complete a lesson with proficiency or complete Launchpadt.

 

Q: Why do I see different average lessons on the Progress and Usage report?

 A: This is likely due to the selected timeframe on the Usage report. The Progress report reflects Year To Date data overall, vs the data in a selected date range (which is possible on the Usage report).

 

Q: What happens to student progress data if Launchpad is activated in the middle of the school year?

A: When Launchpad is enabled, the data source for each student's initial standing is changed and their progress metrics need to be recalculated. The Progress Report will not show any progress from the start of the district school date through when the district enables Launchpad. Students' initial standing level will be calculated after they complete Launchpad. Student progress will begin calculating from this point. Proficiency data on additional DreamBox Math reports is preserved.
 

Q: Will lessons completed on the same day my student completes Launchpad count toward their progress?

A: At this time progress is measured daily. If a student completes Launchpad on Monday and then completes 10 additional lessons in that same day, those 10 lessons are not counted toward that student’s progress. 
 

Q: Should grade-level standing percentages always equal 100%?

A: The percentages shown in the report are rounded to a whole number when standing percentages are calculated. The actual calculation will always add to 100%, but the total rounded percentages may not. 

Support Icons_Learn More_50px.png Example: 44.4% + 39.2% +16.4% would round to 44% + 39% + 16% to = 99%.

 

Printing Student Progress Reports

Q: Can I print DreamBox Math progress reports to send home?

A: Yes. We recommend sharing two resources with families:

Individual Student Progress Report

(Can be printed for a single student or all students in a classroom)

Family Guide to the Progress Report

(Available through DreamBox University in English and Spanish)

Math_Progress Report_Print View of Student Report.png

(Click image to enlarge it)

Math_Progress Report_Updated Family Guide.jpg

(Click image to enlarge it)

Support Icons_Learn More_50px.png
  • Click this link to open the family guide in English or Spanish. (You will need to sign into DreamBox University to download the guide).
  • Click this link to open instructions on how to print progress reports. 

Related to

Updated

Was this article helpful?

2 out of 4 found this helpful